CycleCoffeeCake celebrates a pedal-away success

The first CycleCoffeeCake held today was a pedal-away success. The event, which filled registration within 24 hours of its announcement, shows the latent desire for people of all ages and abilities to gain confidence for cycling on roads, learning safe cycling skills, and enjoy being part of an everyday cycling community. Participants included a man using a recumbent  trike, a proudly self-identifying ‘oldie’, and Snoopy the dog in a bike basket. The sound of bell chimes and happy chats as people cycled side-by-side was pure joy.

CycleCoffeeCake participants enjoying coffee and cake at Ground & Co Salthill – Photo by Paula Healy

Thank you to all who joined us for the first ever #CycleCoffeeCake this morning. It was thrilling to have people of all ages and abilities with a mix of regulars and newbies on bikes join us for a gentle and including Saturday morning spin for coffee and cake.

New bikes and golden oldies

Eimear Ní Fhlatharta, who bought her bike only a fortnight ago, said the experience helped her feel empowered and more confident about taking space while cycling on-road.

Martina Callanan, spokesman for the Galway Cycling Campaign and creator of CycleCoffeeCake, said that this tweet was the reason for doing what we do.

Eimear’s experience is why we set up this social cycling event. We want to enable confidence in people who are new to cycling, or hopping back on the saddle after years or maybe decades. We want to share skills and tips while connecting people with a caring and fun everyday cycling community.

Martina Callanan, spokesperson for Galway Cycling Campaign and creator of CycleCoffeeCake

Before the group departed the start point, a participant asked, “When is the next event?” Gesturing at her red bike with a wicker bike basket, she said, “I’m as old as this bike. I want to cycle!” 

The group asked for CycleCoffeeCake to be a fortnightly event during the summer. We are delighted to respond to this request, and so the next event will take place on Saturday 27 June at 10.30am.

Registration details along with the start point and route details will be announced the week beginning Sunday 20 June.

Route details

The route today went from Nimmo’s Pier to Blackrock before ending in Salthill village with coffee and cake at Ground & Co.

Instead of the off-road cycle path on the shoreline of the Swamp, the group cycled entirely on-road. This is because a kissing gate from Nimmo’s Pier to the Swamp is a Covid-19 contact concern as well as being a mobility obstacle for people with bikes, and in particular, our participant who uses a recumbrent trike.

A recumbent tricycle is a bicycle in which the rider sits in a laid back position while riding it, with their feet in front of them, and has three wheels – File photo

Event partners

Special thanks to Martyna Cwiertnia from An Mheitheal Rothar for giving a terrific bike maintenance talk, which focused on the safety M Check.

The M Check by Velo City, an annual international cycling conference by European Cyclists’ Federation

Check out Martyna’s bike mechanic YouTube channel, Rainbow Bikes, which has helpful easy-to-do bike maintenance tips as well as videos on vintage bicycle restorations.

High Nelly restoration process 2019 by Martyna Cwiertnia on her YouTube channel, Rainbow Cycles

It was easy to choose Ground & Co Salthill as our first event partner. The Aquarium Building is a great location in Salthill with lots of space and seats outside to enjoy our complimentary coffee and cake.

Since coronavirus and lifting of lockdown, more people are arriving by bicycle and the bike stands outside Ground & Co Salthilll have never been so busy. We’re delighted to support CycleCoffeeCake and sponsor this first-ever event.

Kevin Nugent, owner of Ground & Co Salthill

As well as the event group, many more people on bikes were curious about the event and tagged along behind and joined us for coffee and chats.

Importantly for us, this local café has an abundance of secure bike racks, which we filled.

An abundance of bikes securely parked outside Ground & Co Salthill – Photo by Paula Healy

Next event

CycleCoffeeCake will be a regular fortnightly event by the Galway Cycling Campaign during the summer. 

We want to help people feel more confident cycling about town and to and from residential and recreational areas. Each event will take a different route and will offer a theme, a guest guide, or a guest speaker.

Kevin Jennings, chairperson of Galway Cycling Campaign

Cake bike trails will be explored across the city, especially those that end in green and blue areas where we can enjoy coffee, cake and chats in safe and pleasant surroundings, like Terryland Forest Park, the Seven Galway Castles’ Heritage Cycle Trail / Slí na gCaisleán, Cappagh Park, and Ballyloughnane Beach.

As we reopen society after the coronavirus lockdown, we want to support local businesses, especially those that have safe and secure bicycle parking outside.

Martina Callanan, creator of CycleCoffeeCake

We welcome suggestions of routes and local businesses in the comments below, via email [email protected] or through DM on Twitter.

Save the date!

The next event will take place on Saturday 27 June at 10.30am. A registration link will be live in the week before the event.

If you would like to become part of Galway’s everyday cycling community, join the Galway Cycling Campaign for a €10 or a €5 contribution.

Until then, pedal on!

The view from Nimmo’s Pier across the the Long Walk – Photo by Eimear Ní Fhlatharta

Cycling Campaign welcomes changes to Connemara greenway proposals at oral hearing.

The Galway Cycling Campaign has welcomed changes proposed by Galway County Council to the Oughterard to Clifden Greenway at the An Bord Pleanala oral hearing held in Clifden last week. The cyclists had serious concerns about an initial design that would put a recreational cycle-path directly beside high-speed traffic on the N59 for over 11km. At the hearing, held over two days in the Station House Hotel Clifden, the County Council offered an amended design. The new design would use sections of the old railway line and the old Clifden road to provide an additional 6.35Km away from the N59.

Some of the alternatives brought to the Oral Hearing by Galway Cycling Campaign that where adopted. Routes No 1 and No 4 shown below
OpneStreetMapExtract_with_alternatives

The hearing heard some opposition from local landowners, particularly from the Bunscanniff and Glengowla townlands. Keith Geoghegan of Glengowla mines expressed serious concerns about possible ill effects on his business but offered an alternative route through his property away from the old railway track. Some observers expressed the view that visiting tourists should be charged a fee to cross individual land holdings. Mr. Liam Gavin, Senior County Engineer, expressed a preference for following the old Clifden-Galway Railway embankment to the greatest practical extent. Local hoteliers and business owners spoke in favour of the scheme. Mr. Paul Dunne, a Lecturer in Tourism at GMIT spoke in favour of placing the route away from the N59 and cited research on feedback from users of the Great Western Greenway in Mayo. Some contributors took an opposing position arguing for the incorporation of the route into the N59 or of dropping the scheme altogether in favour of investing in local roads.

Evidence was presented at the hearing pointing out that the incorporation of recreational cycle-routes into roads with high-speed traffic is directly contrary to both the 2007 Failte Ireland Tourism Strategy and guidance from the National Trails Office.

According to the cyclists, the overall proposal to develop a 50km Greenway from Oughterard to Clifden, and costed at EU7million, is welcome. If sensitively carried out, the scheme could create a huge asset for the community of West Connemara. They point out that the Western Greenway in Mayo has generated EU7million per year for the local community – indicating significant unmet demand for a particular cycling experience.

An Bord Pleanala recently rejected a Kerry County Council application to put a tourist cycle route directly beside the N86 on the Dingle Peninsula. The Cycle Campaign is hopeful that the eventual Board decision on the Galway greenway may identify further sections of the route that can be taken off road. Even with the changes proposed, 5.15km will still be right beside the traffic on the N59.

Campaign says rejection of controversial Kerry Cycleway proposals good news for Connemara Greenway.

The Galway Cycling Campaign and Cyclist.ie, Ireland’s National Cycling Lobby Group has welcomed An Bord Pleanala’s rejection of a controversial NRA Cycle path scheme for the N86 in the Dingle peninsula. The road scheme running from Camp to Dingle had attracted particular concern because the designers planned to co-locate a tourist cycling path directly beside high speed traffic for the entire length of the N86 scheme (28km). The rejection of the Kerry proposals echoes concerns raised about the proposed Connemara Greenway which is due to go before an Oral hearing next month in Clifden. The cyclists are hailing the decision as a vindication of the Failte Ireland tourism strategy and National Cycle Policy Framework which is to avoid busy roads.

The Galway Cycling Campaign has lodged an objection to the proposed Connemara Greenway on similar grounds: that the cycle paths are placed directly beside high speed traffic for considerable distances alongside the N59 despite the existence of obvious alternatives. With regard to similar cycle paths in Kerry, the Planning Appeals Board have instructed that they be dropped from the scheme. The grounds given include that the proximity to the carriageway might not offer an attractive recreational route. The Board recommends that alternatives possibly using quieter non-national roads would deliver a more desirable and successful cycleway. The Board have asked the applicants to resubmit a scaled back scheme that seeks to minimise interference with natural features such as hedgerows and tree lines. An Bord Pleanala to hold an oral hearing into the proposed Connemara Greenway on the 11th of December.

The proposal to develop a 50km section of the Connemara Greenway from Oughterard to Clifden is welcome. If sensitively carried out, the scheme could create a huge asset for the community of Connemara. They point out that the Western Greenway in Mayo has generated EU7million per year for the local community – indicating significant unmet demand for a particular cycling experience. However the cyclists say that the current scheme is incorrectly conceived, could fail to achieve its aims and could divert significant resources from more beneficial works. The planning appeals board has been asked to reject the scheme in its current format.

Over the entire 50km, long sections of the proposed scheme conform to the commonly accepted “greenway” concept (i.e. it is routed away from high-speed traffic). However, instead of being maintained as a traffic free greenway for the greatest possible distance, the route is to be incorporated into the existing N59 as a cycle path adjacent to fast moving motor traffic for between 11.7 and 14.6 kilometres or approximately 20% of its length. In the EIS carried out for the scheme, the alternatives to incorporating the cycle route into a high-speed road do not appear to have been given due consideration. Nor does any due consideration appear to have been given on the impacts of such traffic on cyclists – who will theoretically include family groups. Most regrettably, the worst affected section of the route could be considered the most scenic as it passes close to the Maamturks mountain range and the South Bens. It is imperative that an off-road solution be found here so that, rather than being 2meters from vehicles travelling up to 100km, users can fully enjoy and appreciate the spectacular scenery in piece and quiet.

The Cycling Campaign has identified various alternative options that fulfil the greenway model. These include sections where the old Galway to Clifden railway bed is still available and sections of parallel minor roads including the original Galway-Clifden road. The alternatives provide a route away from high-speed traffic where the full benefits of a world class cycling route could be provided. In addition to providing a much more attractive route the alternative proposals avoid the need to CPO lands along the N59 itself.

Cycling Campaign welcomes oral hearing into deeply flawed Clifden greenway proposals.

The Galway Cycling Campaign has welcomed the decision by An Bord Pleanala to hold an oral hearing into the proposed Oughterard to Clifden Greenway – describing the current proposals as “deeply flawed”. Their concerns centre on a design that puts a recreational cycle path directly beside high-speed traffic on the N59 for at least 11km. The Cycling Campaign has identified a series of alternatives that would provide a more attractive route and avoid any need to CPO lands along the N59. They are hoping to hold a public meeting so that affected parties can share their concerns.

According to the cyclists, the proposal to develop a 50km Greenway from Oughterard to Clifden is welcome. If sensitively carried out, the scheme could create a huge asset for the community of West Connemara. They point out that the Western Greenway in Mayo has generated EU7million per year for the local community – indicating significant unmet demand for a particular cycling experience. However the cyclists say that the current scheme is incorrectly conceived, could fail to achieve its aims and could divert significant resources from more beneficial works. The planning appeals board has been asked to reject the scheme in its current format.

Over the entire 50km, long sections of the proposed scheme conform to the commonly accepted “greenway” concept (i.e. it is routed away from high-speed traffic). However, instead of being maintained as a traffic free greenway for the greatest possible distance, the route is to be incorporated into the existing N59 as a cycle path adjacent to fast moving motor traffic for between 11.7 and 14.6 kilometres or approximately 20% of its length. In the EIS carried out for the scheme, the alternatives to incorporating the cycle route into a high-speed road do not appear to have been given due consideration. Nor does any due consideration appear to have been given on the impacts of such traffic on cyclists – who will theoretically include family groups. Most regrettably, the worst affected section of the route could be considered the most scenic as it passes close to the Maamturks mountain range and the South Bens. It is imperative that an off-road solution be found here so that, rather than being distracted by traffic, users can fully enjoy and appreciate the spectacular scenery.

The Cycling Campaign has identified various alternative options that fulfil the greenway model. These include sections where the old Galway to Clifden railway bed is still available and sections of parallel minor roads including the original Galway-Clifden road. The alternatives provide a route away from high-speed traffic where the full benefits of a world class cycling route could be provided. In addition to providing a much more attractive route the alternative proposals avoid the need to CPO lands along the N59 itself.

Open Street map extract showing problematic section an alternatives
Photo of section of old Clifden Galway road that will not be used in
the Greenway